Draft — needs reviewStatus: draft — needs review

Glossary term

KPI (key performance indicator)

Short answer

A KPI, or key performance indicator, is a measure tracked over time to show how well an ongoing activity is performing against a target or acceptable range. Unlike an OKR key result, a KPI usually describes steady-state performance rather than a change you are driving.

Good KPIs

  • Have a clear definition and data source.
  • Have an owner.
  • Have a target or acceptable range.
  • Are reviewed on a fixed rhythm.

KPIs and OKRs

A KPI tells you whether things are healthy. An OKR states a change you want. A KPI that drifts out of range often becomes the subject of a new objective.

See your portfolio the way your sponsor should

SprintPM opens soon, in English and Arabic. Join the waitlist to be among the first in.